Clear, Integrated Workflow – Quality and Lead Time Under Control
01
Submission of Drawings and Requirements
Submission of Drawings and Requirements02
Engineering Review and Process Designn
Engineering Review and Process Designn03
Quotation and Lead Time Confirmation
Quotation and Lead Time Confirmation04
Prototyping and Feedback (including inspection)
Prototyping and Feedback (including inspection)05
Mass Production
Mass Production06
Shipment Tracking
Shipment Tracking

